Every contractor on a construction site must open and keep a health and safety file on site (Construction Regulations 2014, regulation 7(1)(b)). Clients call it the safety file, SHEQ file or contractor file, and they check it before you may start. This checklist groups what the OHS Act and the Construction Regulations ask for in eight sections, and lists the mistakes that get a file sent back.


OHS Act 85 of 1993 Construction Regulations 2014 Eight sections

Updated 18 November 2026

How a safety file is used

  1. Tender

    The client's specification

    The client sets out its health and safety requirements for the work (regulation 5(1)(b)).

  2. Before work starts

    Your plan and file

    You answer with a health and safety plan and the file. The client or principal contractor approves them.

  3. While work runs

    Kept on site and current

    Registers filled in, new workers added, expired documents replaced. Audited at least every 30 days.

  4. At the end

    Closed out

    The file stays the record of the work. Most clients ask for a copy at hand-over.

Built from the lawVeriSHEQ lists what your contract needs

The checklist

What goes in the safety file

Eight sections. Some items apply only when the work does: a fall protection plan only where people work at height, an excavation inspector only where you dig.

  1. 1

    Legal, policy and insurance

    A copy of the OHS Act and the Construction Regulations on site; your signed health and safety policy (section 7); COIDA registration and a valid letter of good standing; the section 37(2) mandatary agreement; your letter of appointment; the client's health and safety specification and your approved health and safety plan; the notification of construction work or construction work permit, where the project needs one (regulations 3 and 4).

  2. 2

    Legal appointments

    Signed by both people: the CEO (section 16(1)) and anyone given duties under section 16(2); construction manager and supervisors (regulation 8); construction health and safety officer, registered with the SACPCMP; risk assessor (regulation 9); incident investigator; first aider where there are more than 10 employees; health and safety representatives where there are more than 20 (section 17). Add the activity appointments the work needs: fall protection, scaffolding, excavations, electrical, ladders, lifting.

  3. 3

    Risk assessments and safe work

    The baseline risk assessment; a site-specific risk assessment by the appointed risk assessor; safe work procedures and method statements for each high-risk task; the fall protection plan with its rescue plan where people work at height (regulation 10); the emergency plan (regulation 29); proof the risk assessment was explained to the workers (regulation 9(3)).

  4. 4

    Training and induction

    Site induction records for every worker (regulation 7(5)) and a visitor induction register (regulation 7(6)); task training on the risk assessment; competence certificates for scaffolding, plant operators, work at height and other specialised work; toolbox talk attendance; a training matrix with expiry dates.

  5. 5

    Medical fitness

    A valid medical certificate of fitness for each worker, on the Annexure 3 form, issued by an occupational health practitioner (regulation 7(8)), and the practitioner's registration. Medical surveillance records where workers are exposed to noise, dust, chemicals, lead or asbestos.

  6. 6

    Personal protective equipment

    A PPE needs analysis per task; a signed issue register showing PPE given free of charge (General Safety Regulations, regulation 2); PPE inspections; proof the PPE meets the relevant SANS standard.

  7. 7

    Plant, equipment and inspection registers

    Inspection registers for ladders, hand and power tools, electrical installations and distribution boards (regulation 24), fire equipment, machinery and lifting equipment; the electrical certificate of compliance; the scaffold register where scaffolds are used.

  8. 8

    Site records

    An index of the file; the incident register (Annexure 1 of the General Administrative Regulations) and incident investigations; the first aid register; monthly health and safety audit reports (regulation 7(1)(c)(vii)); emergency contact numbers displayed on site.

A summary in our own words, not legal advice. Check the current regulations; your client's specification can ask for more.

Common mistakes

Why safety files get sent back

Most rejected files fail on the same six things.

Generic risk assessments

Copied from another job. The risk assessment, method statements and fall protection plan must match this site and this work.

Expired documents

Medical certificates, the letter of good standing and training certificates expire. Check each date before you submit.

Unsigned appointments

An appointment needs the employer's and the appointee's signatures and a date. One signature is not enough.

Workers missing

A new worker on site with no induction record, medical certificate or PPE issue entry.

Registers left blank

Inspection registers that are printed but never filled in. An empty register shows the inspection did not happen.

The file is not on site

It sits in the office. The law says it is kept on site, ready for an inspector.

Who keeps the file? Usually the SHEQ officer. New to the terms? Read what SHEQ means.

FAQ

Frequently asked questions

What is a safety file?

A health and safety file is the set of documents a contractor keeps on site to show it complies with the OHS Act and the Construction Regulations 2014. It is also called a SHEQ file or a contractor safety file.

Is a safety file a legal requirement?

Yes, for construction work. Regulation 7(1)(b) of the Construction Regulations 2014 requires every contractor to open and keep a health and safety file on site. Outside construction, clients often ask for one in the contract.

Who checks the safety file?

The client or principal contractor checks it before work starts and audits it while work runs, and an inspector of the Department of Employment and Labour may ask to see it at any time.

How long is a medical certificate of fitness valid?

Each worker needs a valid certificate of fitness for the construction work they do, issued by an occupational health practitioner on the Annexure 3 form (regulation 7(8)). Most are issued for a year; check the expiry date on each one.

How often must the safety file be audited?

The principal contractor audits each contractor's health and safety at least every 30 days (regulation 7(1)(c)(vii)). Keep the audit reports in the file.

Can I use a generic safety file template?

A template helps you start, but the risk assessments, method statements, fall protection plan and appointments must be specific to the site and the work. A generic file is the most common reason a file is rejected.

Can VeriSHEQ build a safety file?

Yes. VeriSHEQ lists what the law asks for on your contract, shows what proves each line, tracks expiry dates, and can check the file with AI to list what is still missing.

Get started

Build your safety file from the law

VeriSHEQ lists what the law asks for on your contract and site, shows what proves each line, reminds you before documents expire, and can check the file with AI to list what is still missing.

The Free plan needs no card Cancel anytime on month-to-month Set up in minutes